County Board of Supervisors · Tuesday, October 20, 2026, 9:00 AM · Item 12 · REGULAR AGENDA
Briefing on county preparations for an El Niño winter
In plain English
County staff would give the Board of Supervisors a presentation on how county departments and partner agencies are getting ready for a forecast very strong El Niño winter, and the Board would direct the Office of Response, Recovery and Resilience to come back with status updates during the winter as needed. The report describes alert system upgrades (CruzAware), door-to-door outreach in flood-prone neighborhoods, road ditching and culvert clearing, rain and stream gauge monitoring, Emergency Operations Center training, and levee and sediment work on the Pajaro River system. A yes vote accepts the report and the reporting-back direction; the report states there is no additional financial impact because the work is funded within existing budgets, Measures K and Q, and preparedness grants.
Residents in flood- and landslide-prone areas — including Felton Grove, Paradise Park, Rio Del Mar, Soquel Village, Capitola Village and the Pajaro area — are the focus of evacuation outreach, drainage work and levee repairs, and coastal businesses and infrastructure face waves riding on an estimated extra foot of sea level from a warm-water "Kelvin wave."
Key facts
- NOAA's Climate Prediction Center gives a greater than 90% chance of a very strong El Niño this fall and winter, with a 75% chance of a historic event during October–December 2026; the Niño 3.4 index reached +1.8°C in August.
- A Kelvin wave is expected to raise local sea levels about 1 foot above forecast tides, on top of roughly another foot during strong storms — 2 feet or more above normal during large winter wave events.
- With $2 million in Measure K funding, the County is on track to clear roughly 250-260 linear miles of county roads and ditches this year, up from 204 miles last year and 83 miles the year before.
- As of October 7, 2026, Community Emergency Response Team volunteers had made positive contact with 649 residents/businesses and held 246 preparedness conversations, with about 2,000 positive contacts anticipated.
- The Office of Response, Recovery and Resilience closed a Request for Proposal on October 9, 2026 for standby disaster support contracts (feeding, transportation, laundry and linen, public information), with awards anticipated in December 2026; costs are incurred only if activated.
Reasons to support
- CruzAware now has pre-scripted templates in English and Spanish for 41 message types and alert zones matched to evacuation, flood-prone and burn-scar areas, so warnings go out faster and only to affected residents.
- Winter on-call road staffing has doubled from one team to two, with heavy equipment staged countywide, sandbags and flood-fighting supplies pre-positioned, 250 feet of Muscle Wall flood barrier on hand, and 24-hour availability of emergency contractors verified.
- Pajaro Regional Flood Management Agency work targets known weak points: seepage blankets and berms at the "M-bend," sediment already removed at the Corralitos–Salsipuedes confluence as of October 2, 2026, a Martin Ditch culvert replacement expected before January 1, 2027, and a backup generator for the Atri Court pump station.
Reasons to oppose or change it
- The report itself notes the El Niño–rainfall link is strongest in Southern California and less consistent in Central and Northern California, so a historic event does not guarantee severe local impacts — raising the question of whether the level of spending and staffing matches the actual local risk.
- Several pieces are not finished before storms can arrive: the Coastal Incident Response Plan update is still in progress, care and shelter contracts are not expected to be awarded until December 2026, Finance/Administration Emergency Operations Center training is not scheduled until February 8-9, 2027, and further sediment removal under the Highway 152 bridge awaits a Caltrans encroachment permit.
- Extending Pajaro River vegetation thinning further downstream depends on optional contract tasks "if funding is available," so some downstream conveyance work may not happen this winter.
Official wording
Consider presentation on Operational Area El Niño winter preparedness activities, and take related actions (Office of Response, Recovery and Resilience)