County Board of Supervisors · Tuesday, October 20, 2026, 9:00 AM · Item 41 · CONSENT AGENDA
Seek up to $1,798,732 in federal funds for Empire Grade and intersection safety fixes
In plain English
County Public Works wants permission to apply for a federal Local Highway Safety Improvement Program grant of up to $1,798,732. The money would pay for traffic safety work drawn from the county's Safety Action Plan: 752 retroreflective backplates on traffic signal heads, bigger reflective signs and reflective post strips at 91 unsignalized intersections with three or more crashes between 2019 and 2023, and on Empire Grade between Heller Drive and Fuel Break Road, 1.3 miles of centerline rumble strips, 12 chevron curve signs and three speed feedback signs. A yes vote only authorizes the grant application; it does not yet award or spend construction money.
Drivers, cyclists and pedestrians on Empire Grade and at dozens of intersections across the unincorporated county would see new signs, reflective materials and rumble strips, and the county would commit local transportation dollars as a match if the grant is won.
Key facts
- Grant request: up to $1,798,732 from the Local Highway Safety Improvement Program; total direct project cost estimated at the same $1,798,732.
- Local match of up to $359,746 — about $313,820 for the countywide intersection work and $45,926 for Empire Grade; federal reimbursement may be up to 90 percent for eligible safety countermeasures.
- Empire Grade between Heller Drive and Fuel Break Road recorded the highest number of injury crashes of any roadway segment in the unincorporated county from 2019 to 2023.
- Work list: 752 retroreflective signal backplates; signage and reflective post strips at 91 unsignalized intersections; 1.3 miles of centerline rumble strips, 12 chevron signs and three speed feedback signs.
- Match sources named: Measure D, County Service Area 9, Transportation Development Act funds, Surface Transportation Block Grant funds, and District 3's Measure K allocation.
Reasons to support
- The Empire Grade segment had a documented pattern of injury crashes from 2019 to 2023 at a rate exceeding what would be expected, and the Safety Action Plan the Board approved on May 19, 2026 ranked it the highest-priority corridor in the unincorporated county.
- Federal funds could cover up to 90 percent of eligible costs, so roughly $1.4 million of safety work would be paid for with about $359,746 in local money.
- The intersection measures are low-cost items applied at scale — backplates at every signal and reflective signage at 91 crash-prone unsignalized intersections — which spreads the safety benefit countywide and advances the Vision Zero goal the Board adopted on August 23, 2022 of ending traffic deaths and serious injuries by 2035.
Reasons to oppose or change it
- Winning the grant obligates up to $359,746 in local matching funds across multiple future budgets, drawn from Measure D, County Service Area 9, Transportation Development Act, Surface Transportation Block Grant and District 3 Measure K money that could otherwise go to paving or other road needs.
- The actual reimbursement ratio is not locked in — it is set later when the state approves the 'Authorization to Proceed' — so the county's share could end up larger than the 10 percent minimum assumed here.
- Centerline rumble strips on Empire Grade create ongoing noise for nearby residents and can affect cyclists using the corridor, a tradeoff the item does not weigh.
Official wording
Authorize grant application to the Federal Highway Administration Local Highway Safety Improvement Program in the amount of up to $1,798,732 for safety improvements on Empire Grade and countywide intersection improvements (Community Development and Infrastructure - Public Works)
Summary written by claude-opus-5 from the agenda and the Staff Report. It can contain mistakes. The official documents govern.